Search DRA Projects

Search DRA Projects

 
 

Commercial

DR Anderson completed a remodel of the Boys Town Youth Care Building. This project was a complete remodel of approximately 30,000 SF that had not been updated since the 1970’s. The project included two new stairwells from the first to the basement level, an elevator restoration, all new mechanical equipment, electrical, lighting, data, flooring, curved architectural ceilings, glass handrail, all wood trim, new bathrooms, doors, hardware, casework, windows, and a court yard renovation. The project was completed on-time and under budgetDR Anderson completed a remodel of the Boys Town Youth Care Building. This project was a complete remodel of approximately 30,000 SF that had not been updated since the 1970’s. The project included two new stairwells from the first to the basement level, an elevator restoration, all new mechanical equipment, electrical, lighting, data, flooring, curved architectural ceilings, glass handrail, all wood trim, new bathrooms, doors, hardware, casework, windows, and a court yard renovation. The project was completed on-time and under budget.

DR Anderson and its subcontractor team removed and replaced the roof structure on UNMC’s Central Utility Plant. Originally built in 1919, and expanded in the 1940’s, the existing wood timber roof structure was removed and replaced with modern steel fire resistant construction. The project was completed over the summer months while maintaining the fully functioning boiler plant below. A temporary scaffold/roof structure was built in the plant to protect boilers, insulation, controls, and high voltage electrical gear in the basement.

D.R. Anderson (DRA) successfully bid and was awarded this renovation project with Metropolitan Community College at their South Omaha Campus. Upon selection, DRA proposed value-engineering options which provided in excess of $40,000 in savings to MCC.

DR Anderson successfully completed this facility for Metropolitan Community College as a link to bring their existing facilities together with a new public library and transportation facility. This building also serves as a student center with public meeting areas and numerous classrooms.

D.R. Anderson (DRA) successfully negotiated this renovation project with Pinnacle Bank. DRA was selected for this project based on our qualifications and fee for this cost-plus GMP project delivery.

Continuing our relationship with PCS, DR Anderson was selected as General Contractor for PCS’ Weeping Water Office Renovation. DRA has previously completed PCS’ Raymond Mill installation, Safe Haven project, Load-out Addition as well as their Quality Control Lab Remodel.

DR Anderson was selected as general contractor for another project at PCS’ Weeping water facility. DRA had previously completed PCS’ Raymond Mill installation as well as the Safe Haven project where DRA constructed multiple storm shelters meeting FEMA disaster requirements.

DR Anderson constructed two new public Compressed Natural Gas (CNG) filling stations and completed upgrades to MUD’s private existing fleet fueling facility. The public filling stations are a first for the Omaha Metro area and when constructed were the only public fueling stations between Chicago and Denver along the I-80 corridor.

DR Anderson constructed this building adjacent to the existing IBEW offices and meeting hall. This required careful coordination between DR Anderson’s management team and our client, IBEW. This project was successfully completed in phases without any major interruptions or delays in our clients daily operations.

Pages

 
Subscribe to RSS - Commercial