Search DRA Projects

Search DRA Projects

 
 

Carpentry

DR Anderson completed a remodel of the Boys Town Youth Care Building. This project was a complete remodel of approximately 30,000 SF that had not been updated since the 1970’s. The project included two new stairwells from the first to the basement level, an elevator restoration, all new mechanical equipment, electrical, lighting, data, flooring, curved architectural ceilings, glass handrail, all wood trim, new bathrooms, doors, hardware, casework, windows, and a court yard renovation. The project was completed on-time and under budgetDR Anderson completed a remodel of the Boys Town Youth Care Building. This project was a complete remodel of approximately 30,000 SF that had not been updated since the 1970’s. The project included two new stairwells from the first to the basement level, an elevator restoration, all new mechanical equipment, electrical, lighting, data, flooring, curved architectural ceilings, glass handrail, all wood trim, new bathrooms, doors, hardware, casework, windows, and a court yard renovation. The project was completed on-time and under budget.

DR Anderson constructed two multi-story buildings for Nebraska Christian College on their new 80-acre campus south of Omaha. Each building includes student residences, administrative offices, classrooms, and library space. A student center and cafeteria are included as well. Both buildings were completed simultaneously by DRA and feature wood framing, masonry foundations, and exteriors finishes including EFIS, brick, and split face CMU. Combined, both facilities total over 45,000sf.

D.R. Anderson (DRA) successfully bid and was awarded this renovation project with Metropolitan Community College at their South Omaha Campus. Upon selection, DRA proposed value-engineering options which provided in excess of $40,000 in savings to MCC.

DR Anderson successfully completed this facility for Metropolitan Community College as a link to bring their existing facilities together with a new public library and transportation facility. This building also serves as a student center with public meeting areas and numerous classrooms.

D.R. Anderson (DRA) successfully negotiated this renovation project with Pinnacle Bank. DRA was selected for this project based on our qualifications and fee for this cost-plus GMP project delivery.

Continuing our relationship with PCS, DR Anderson was selected as General Contractor for PCS’ Weeping Water Office Renovation. DRA has previously completed PCS’ Raymond Mill installation, Safe Haven project, Load-out Addition as well as their Quality Control Lab Remodel.

Continuing our relationship with PCS, DR Anderson was selected as General Contractor for PCS’ Weeping Water Mine Maintenance Facility. DRA has previously completed PCS’ Raymond Mill installation, Safe Haven project, Load-out Addition, Quality Control Lab Remodel, and Administration Office Remodel.

The Maintenance facility includes offices for the Mine Foreman as well as conference room, lockers, and a break room for the miners. The maintenance area includes extra thick floors and large overhead doors for servicing off-road haul-trucks and other mine equipment.

DR Anderson has completed another project with the LDS church. This project was a new Meeting House for the Council Bluffs Stake in Glenwood Iowa. Past projects included the Blair Meeting House addition as well as other renovations and small projects throughout the Omaha Metropolitan area.

DR Anderson constructed this building adjacent to the existing IBEW offices and meeting hall. This required careful coordination between DR Anderson’s management team and our client, IBEW. This project was successfully completed in phases without any major interruptions or delays in our clients daily operations.

Pages

 