D. R. Anderson competitively bid and was awarded the renovation and additions of Carriage Hill Elementary by the PLCS School Board.  The project included classroom, administrative office, secure entrance, and kitchen additions.  All classrooms were renovated during the project which also included mechanical, electrical, low voltage, and fire suppression replacements and improvements throughout the building.  

Due to extensive phasing and staff coordination the project was completed early and in time for the school year.

D. R. Anderson Constructors Co. competitively bid and was awarded the additions and renovation project of Anderson Grove Elementary by the PLCS School Board.  

DRA was chosen to construct ACCESSbank's new branch in the AKSARBEN development area.  The construction of the branch was completed during a 6 month time period and significant budget savings were provided to the client. 

DRA was selected as the Construction Manager at Risk (CMAR) by Omaha Public Schools to manage and construct the additions and renovations to Nathan Hale Middle School.  

The project included multiple additions and complete renovation of the school over a 20-month construction period.  The school was occupied and in operation during the majority of the construction.  This was accomplished by multiple phases and extensive temporary construction to ensure the maintenance of safety, security, and schedule.

DR Anderson completed a remodel of the Boys Town Youth Care Building. This project was a complete remodel of approximately 30,000 SF that had not been updated since the 1970’s. The project included two new stairwells from the first to the basement level, an elevator restoration, all new mechanical equipment, electrical, lighting, data, flooring, curved architectural ceilings, glass handrail, all wood trim, new bathrooms, doors, hardware, casework, windows, and a court yard renovation. The project was completed on-time and under budgetDR Anderson completed a remodel of the Boys Town Youth Care Building. This project was a complete remodel of approximately 30,000 SF that had not been updated since the 1970’s. The project included two new stairwells from the first to the basement level, an elevator restoration, all new mechanical equipment, electrical, lighting, data, flooring, curved architectural ceilings, glass handrail, all wood trim, new bathrooms, doors, hardware, casework, windows, and a court yard renovation. The project was completed on-time and under budget.

DR Anderson constructed two multi-story buildings for Nebraska Christian College on their new 80-acre campus south of Omaha. Each building includes student residences, administrative offices, classrooms, and library space. A student center and cafeteria are included as well. Both buildings were completed simultaneously by DRA and feature wood framing, masonry foundations, and exteriors finishes including EFIS, brick, and split face CMU. Combined, both facilities total over 45,000sf.

D.R. Anderson (DRA) successfully bid and was awarded this renovation project with Metropolitan Community College at their South Omaha Campus. Upon selection, DRA proposed value-engineering options which provided in excess of $40,000 in savings to MCC.

DR Anderson successfully completed this facility for Metropolitan Community College as a link to bring their existing facilities together with a new public library and transportation facility. This building also serves as a student center with public meeting areas and numerous classrooms.

D.R. Anderson (DRA) successfully negotiated this renovation project with Pinnacle Bank. DRA was selected for this project based on our qualifications and fee for this cost-plus GMP project delivery.